Our Mission

To provide engineering solutions to each of our customer while constantly upgrading our products, skills, system, and technology in line with customer needs and requirements. To safely deliver products and services which is commercial and technical compliance in timely manners.

Our Vision

To become the most trusted vendor of trading and services in the engineering industry, as well as to become the most valued business partner to each of our customer.

1976
Established

Innovating Electrical Solutions for a Connected Future

Founded in 1976, is one of the best known private manufacturing, trading and contracting firms in Egyp working in the field of electrical power engineering.

ALDAWLIA employs 130 highly qualified permanent staff.

ALDAWLIA is a rapidly growing company in the sector of low voltage panel building, sheet metal enclosures and supplying of electrical and distribution materials. ALDAWLIA operates from two production facilities in 6th of October city in Egypt. ALDAWLIA operates from a 7000 square meters production facility With our highly trained,- experienced and dedicated staff, we provide high class products and services to our customers.

ALDAWLIA is ISO 9001:2015, ISO 45001:2018 and ISO 14001:2015 certified. All operations are governed by a quality based manufacturing policy reflected at all levels of the company ensuring maximum customer satisfaction.

We are dedicated to providing our customers with excellence in quality and service at a competitive cost.

Established 1976

1976

First Workshop Downtown, Cairo (100 m2)

1981

Moved to a new workshop in Giza (310 m2)

1989

Factory in 6th of October city (1650 m2 – 4 floors)

1992

Authorized distributor and panel builder for General electric

1996

ISO 9001 certified

1998

  • License partner with Hensel electric (Germany) in the PTTA Mi system
  • Schneider electric partner and certified panel builder

2002

Schneider Prisma partner

2012

Schneider Prisma (iPM) partner

2014

License partner with CUBIC (Denmark) in verified assemblies up to 7000A

2015

Head quarter in the 6th of October city (7000 m2)

2020 Expansion in new factory at Polaris park in the LED business (4500 m2)